Purpose: Upgrading Transmission Watermain

This project was for JSJ Construction to install 4,422LF of 12in and 120LF of 6in Waterlines. During this project we had to make bores under concrete driveways and roadways which included casing. Others materials installed were 6-12in Gate Valves, 2-6in Gate Valves, 3- Fire Hydrant assemblies, and some smaller concrete driveways repairs. The line ended with a 4in blow off assembly so that white house could properly flush the lines when needed. During this process we were able to properly and safely cross 2 sections of creeks that the crews had no issues with. Each creek was installed with steel casing to protect the waterline and help with easier access to the main if needed. Completion of this project ensured WHUD with a better more durable waterline to extend in the future when needed.

Contract Info

Contract Time: 2023-2024

Project Completion: 4/16/2024

owner

White House Utility District

3303 US-31 White House, TN

engineer

Green-LID Design

major subcontractors

  • JR Construction
  • Pavement Restoration Inc.
  • Guardian Traffic Control
  • Chad Rodgers Trucking

View Our Project Gallery

Discover our completed projects showcasing our expertise in excavation, utilities, and site preparation. Visit our gallery to see our work.

Get in Touch

Start Project with Us

Reach out today to discuss your project needs and request a free consultation.

Contact Us

Share by: