WHUD 12in Upper Station Camp Drive PH-1
WHUD 12in Upper Station Camp Drive PH-1
Purpose: Upgrading Transmission Watermain
This project was for JSJ Construction to install 4,422LF of 12in and 120LF of 6in Waterlines. During this project we had to make bores under concrete driveways and roadways which included casing. Others materials installed were 6-12in Gate Valves, 2-6in Gate Valves, 3- Fire Hydrant assemblies, and some smaller concrete driveways repairs. The line ended with a 4in blow off assembly so that white house could properly flush the lines when needed. During this process we were able to properly and safely cross 2 sections of creeks that the crews had no issues with. Each creek was installed with steel casing to protect the waterline and help with easier access to the main if needed. Completion of this project ensured WHUD with a better more durable waterline to extend in the future when needed.
Contract Info
Contract Time: 2023-2024
Project Completion:
4/16/2024
owner
White House Utility District
3303 US-31 White House, TN
engineer
Green-LID Design
major subcontractors
Discover our completed projects showcasing our expertise in excavation, utilities, and site preparation. Visit our gallery to see our work.
Get in Touch
Reach out today to discuss your project needs and request a free consultation.
JSJ Construction, LLC delivers expert utility and excavation services, building essential infrastructure in Middle TN.
contact us
contact us
© 2025 Copyright JSJ Construction, LLC. All Rights Reserved.
Site Powered By Revolution 1 Media